Due to the recent Covid 19 restrictions announced by the Government, our designers will be offering design appointments by phone or e-mail only. To book an appointment simply e-mail sales@cherrymore.ie or call your local showroom number. Our showrooms will be closed to the public from Friday, 8th January, until further notice. We look forward to welcoming you back soon, but in the prevailing time do not hesitate to call or e-mail us to start planning your dream kitchen or bedroom project.
Close
Painted & Natural Timber Collection
Heavy Duty & Engineered Collection
Küche Colore Collection
Accessories
Hinged
Sliding
Walk-In
Accessories
Painted
Küche Colore
Hinged Bedrooms
Sliding Bedrooms
Walk-In Bedrooms
Bedrooms Accessories
Painted Visualiser
Küche Colore Visualiser
Price Estimates
Gallery
About
Get In Touch
Get A Design Appointment
import_contacts
VIEW OUR KÜCHE COLORE COLLECTION
import_contacts
VIEW OUR CHERRYMORE COLLECTION
event
GET A DESIGN APPOINTMENT
HOME
KITCHENS
arrow_drop_down
BEDROOMS
arrow_drop_down
VISUALISER
arrow_drop_down
MORE
arrow_drop_down
PRICE ESTIMATES
GALLERY
ABOUT
GET IN TOUCH
Home
KITCHEN
Painted & Natural Timber
Heavy Duty & Engineered
Küche Colore Collection
Accessories
Design Appointment
Price Estimates
BEDROOM
Hinged
Sliding
Walk-In
Accessories
Gallery
About Us
Contact Us
menu
How We Work....
Step 1 - Preliminary appointment
Browse around the showroom and if you a have any questions we will happily answer them.
We will advise on products and appliances.
Step 2 - Book a full design consultation
Our designers will provide 3D visuals, electrical and plumbing drawings and prepare quotation based on the range you are interested in as well as the appliances and accessories chosen.
€150.00 design fee - when you decide to go ahead with Cherrymore, we will take the design fee off the overall bill.
Step 3 - Deposit
50% deposit is payable when ordering.
Delivery dates are only set once 50% deposit is paid and final measurements have been confirmed.
Step 4 - Production
Kitchen and bedroom cabinetry is manufactured based on final drawings.
Step 5 - Delivery
Delivery dates are set by the factory.
Two week's notice is required if the delivery date needs to be rescheduled.
Fitting of kitchen takes place 1-2 days after delivery.
navigation